Switching from Wizard Edit Data in Detailed Data Edit.

0 votes
asked by about eQUEST
edited by

I am currently an engineering student working for a building simulation using eQUEST.

I am wondering if you create the entire simulation using wizard edit and you switch to detailed edit mode in order to generate hourly reports, would all the information transfer successfully?

1 Answer

0 votes
No avatar answered by (25.4k points)
edited by

Yes, you can switch between wizard edit mode to detailed edit mode in order to generate hourly reports without any kind of problems (all information will be transferred successfully). After you finish your project in the wizard edit mode, save it and after that open it the detailed mode.

Your answer

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register
...