How can I calibrate the UPS using this software after changing the batteries?

0 votes
asked by about Liebert MultiLink

Model name of the device: Liebert PSI 1440

1 Answer

0 votes
answered by (91.2k points)

To calibrate the UPS using the Liebert MultiLink software after changing the batteries, open the software and go to the “Calibration” tab. Select the Liebert PSI 1440 model from the drop-down menu and follow the on-screen instructions.

Your answer

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register
...