Multiple product settings

0 votes
asked by about PME Assistant
edited by

I am installing a machine with multiple assembly functions. I want to ensure that assemblies have been completed correctly using the HBM system (as we have different products). Can we set up multiple settings to monitor assembly operations with different settings?

1 Answer

0 votes
No avatar answered by (236k points)
edited by

There is a PDF guide available for this process. Access the PDF file, then open it with a compatible PDF reader. You will find information about PME Assistant configuration and HBM systems.

Download PDF: http://www.sensor-hbm.com/upload/product-file/a2392.pdf

Unfortunately, this is the only help file I could obtain for this procedure.

Your answer

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register
...