Wrong work weeks.

0 votes
asked by about TimeCard Manager
edited by

Our work weeks run Sun - Sat (e.g., 9/11 - 9/17). However, for some reason, our weeks are now running Thursday / Wednesday. I've looked through the setup and can't figure out where this setting is so that I can reset it.

1 Answer

0 votes
No avatar answered by (329k points)

I strongly recommend checking the available Program guide where everything about the software is explained in details. The Program guide is available in PDF file format and can be downloaded through the link posted below. Make sure that you have a compatible PDF reader installed, before opening the file or you'll encounter errors.

Compatible PDF readers download: here!